I'm told a number of replacement signals have been installed at St Helens recently. In most cases a new post and head, but at least one is a new head on the existing bracket.
As far as I am aware, these are one-for-one replacements and not a full-blown resignalling project, and the signalling continues to be controlled from the same box. Certainly, they are still plated 'SH'.