The report comes up with a prioritised list of lines in northern England which are recommended for future electrification projects. In the Northwest these are as follows:
Tier One (2019 to 2024)
- Calder Valley – Leeds to Manchester and Preston via Bradford and Brighouse.
- Liverpool to Manchester via Warrington Central.
- Southport and Kirkby to Salford (via Atherton).
- Chester to Stockport.
- Bolton to Clitheroe.
- Hazel Grove to Buxton.
- Warrington to Chester.
- Manchester to Sheffield and local services in south east Manchester.
- Chester to Crewe.
- Burnley to Colne.
- Preston to Blackpool South.
- Carnforth to Barrow.
- Preston to Ormskirk.
- Skipton to Carlisle.
- Cumbrian Coast.
- Skipton to Heysham.
Update: A more detailed examination of the report revealed that all the maps show the Ashburys to Philips Park line as non-electrified. After a quick exchange of emails with Rail North I am pleased to confirm that this is a minor error in the report, and not a cancellation of part of phase 5.
I wouldn't be surprised if the Liverpool to Manchester CLC line isn't at the top of this list.
ReplyDelete